Developer pool
Drag a developer into a time slot to assign them. Click × on a chip to unassign.
Projects
Manage the projects shown in each period. Changing this list rebuilds the timeline.
Timeline
Switch between quarterly and monthly views.
Each project appears in every period. A developer can appear on multiple projects in the same period; conflicts will show in red.